Partial List Of Completed Projects

PROJECT NAME SCOPE
UOA Damansara Chiller Controls
Ambulatory Care Centre (ACC), Ipoh G Hospital BMS, HVAC controls
Affiliated Computer Systems, Cyberjaya Internet enabled Server Room Humidity &
Temp controls via IQ3xcite web controller
Celebrity Fitness – Gurney Plaza & Subang Parade Air Conditioning Controls
UOA Pantai Chiller Controls
Shell Central Luconia HVAC & DCS SCADA AUTOMATION
YTL 4G  WiMAX Data Center Central Monitoring System
Pacnet Global (Singapore) Data Center Software Driver Interface
OCBC(Singapore) Data Center Software Driver Interface
CSC(Singapore) Data Center Software Driver Interface

Project : SHELL CENTRAL LUCONIA

Services : ZERO HVAC PLC DOWN TIME & DCS SCADA INTERFACE

Year : 2008

  • Design & Upgrade HVAC controls
  • Critical Missions Control – Zero HVAC PLC Downtime for DCS Oil Well Automation
  • Modbus Interface with DCS
  • Air Cooled Chillers Direct Pump Down Sequencing
  • WAN & WEB Access HVAC
  • Intelligent Pre-Surge Power Isolation & Auto Reclose

Project : Ambulatory Care Centre, Ipoh General Hospital (ACC Ipoh)

Services : TREND Building Automation System for HVAC and Central Electrical Monitoring System

Year : 2005

Project of 1,100 points, commenced Jan 2005, completed in record time by April 2005. Supervisory & Control of HVAC, Electrical HT & LV, UPS, Lighting, Fire Alarm, Lift, Hot Water, Medical Gas, Cold Water and Public Announcement.

Hospital accommodates 76 beds, 6 operating theaters, patient wards in level 2, an auditorium and specialist office in level 4 and outpatient clinics in level 1. The Air-conditioning powered by 4 chillers, 21 AHUs & over 50 FCUs.

Project : UOA (United Overseas Australia) Damansara

Services : CHILLER PLANT OPTIMIZATION

Year : 2004

15-20% ENERGY SAVINGS

  • Chiller Reduction – From 3 to 2 Chillers running
  • Modification of chiller piping and zoning of heat transfers added with automation brought about savings on their monthly electricity bill